It costs around 15,000 per lane ( just the lane it self and machine) if you want the scoring system as well...20,000
It costs around 15,000 per lane
It costs around 15,000 per lane ( just the lane it self and machine) if you want the scoring system as well...20,000
Can't help with the lorry.
However a McDonnell Douglas AV-8B Harrier II did cost about $25m when new.
Hope this helps.