- Original Poster
- #1
I've got a woo project that needs more time than I have available.
The dev site has a lot of work already complete but there are a number of custom features need sorting.
Go live is going to be 1 Dec but there isn't an awful lot still to do.
The dev site has a lot of work already complete but there are a number of custom features need sorting.
Go live is going to be 1 Dec but there isn't an awful lot still to do.