- Original Poster
- #1
I have just laid 20m2 of patio onto MOT base with sharp sand and then the flags and then pointed with building sand 4:1 mix.
The whole garden is sodden and has recently had a land drain installed to try and allieviate the problem
My problem is that the pointing has hardened but is still wet as if the water from under the paving it evaporating through
Any advice would be appreciated.
Regards
Gordon
The whole garden is sodden and has recently had a land drain installed to try and allieviate the problem
My problem is that the pointing has hardened but is still wet as if the water from under the paving it evaporating through
Any advice would be appreciated.
Regards
Gordon