Owner A (business owner) asked if I would make a set of blinds for customer B (her client) who also happens to be her friend. Owner A custom printed the fabric and sent this to me to make up the blinds. There were 4 in total, all slightly different widths but all the same length.
This verbal order by Owner A was made in March 2010. Despite several requests the fabric did not arrive until November 2010. There was a delay of a few days while I ordered the remaining stock required to complete.
Customer B was anxious to have her blinds by Christmas but I suggested that due to the late arrival of the fabric this would not be possible as I also had other work that required completing. I put this work into the general queue with a promise to try and finish by Christmas. I also stated at this time and at many subsequent times that these blinds could not be rushed as they had to be exactly the same.
We then had severe bad weather at the end of November right through until January and I informed Customer B that I was not prepared to go into work in such conditions and that unfortunately it would be early in the New Year for completion. Customer B said that this was all right.
As these blinds were to go round a room, I had to ensure that all the rods were at the same height. I made the first blind to use as a template for the other 3. I had started the next 2 blinds together as they were within 5 cm of the same size.
I had to stop work again due to severe illness. This took me to the middle of March 2011. Again I communicated this to Customer B who sympathised and said she could wait. I then returned to work on a gradual basis as my health allowed. Owner A was informed of all the changes and delays as they occurred. Owner A was happy with the situation and acted as a go between.
During this time I did not take on any other work as getting the blinds finished was my priority.
Meantime Owner A, whom I did general contract work for, required a large order to be made up ASAP. I stated that I had restarted the blinds and that they would have to wait in that case. I asked Owner A to contact Customer B to say that she herself had in fact caused a further delay.
My health required lengthy therapy and I required lengthy periods of rest. I communicated this to Customer B who was now quite anxious to see her blinds. (I asked if she could wait until my therapy had finished in the summer. She agreed). She felt that it had taken too long (I have no argument with that) but as I had informed her along the way of all the delays which were the result of situations out with my control, I had thought that she understood.
She had had several conversations with Owner A over this period of time and changed her mind, and Owner A came to collect one finished blind, 3 unfinished blinds and all the parts so that someone else could finish them. She had in fact called me on a couple of occasions worse the wear of alcohol and had been slightly out of control. I asked her on both occasions not to phone me at such times as I did not merit any verbal abuse.
I have invoiced owner A for the lining fabric, parts, one heading rail and a completed blind - the work I have done.
Owner A is refusing to pay. She says the order came from the client. It was in fact Owner A who first asked me if I could make some blinds. It was not until I got the fabric that customer B contacted me with measurements.
I really would like to be paid what I am due and I believe that owner A is the one to receive the invoice. Customer B would not have asked me to make the blinds herself as she lives near Chester. I doubt she would have found me, nor contacted me independently.
This verbal order by Owner A was made in March 2010. Despite several requests the fabric did not arrive until November 2010. There was a delay of a few days while I ordered the remaining stock required to complete.
Customer B was anxious to have her blinds by Christmas but I suggested that due to the late arrival of the fabric this would not be possible as I also had other work that required completing. I put this work into the general queue with a promise to try and finish by Christmas. I also stated at this time and at many subsequent times that these blinds could not be rushed as they had to be exactly the same.
We then had severe bad weather at the end of November right through until January and I informed Customer B that I was not prepared to go into work in such conditions and that unfortunately it would be early in the New Year for completion. Customer B said that this was all right.
As these blinds were to go round a room, I had to ensure that all the rods were at the same height. I made the first blind to use as a template for the other 3. I had started the next 2 blinds together as they were within 5 cm of the same size.
I had to stop work again due to severe illness. This took me to the middle of March 2011. Again I communicated this to Customer B who sympathised and said she could wait. I then returned to work on a gradual basis as my health allowed. Owner A was informed of all the changes and delays as they occurred. Owner A was happy with the situation and acted as a go between.
During this time I did not take on any other work as getting the blinds finished was my priority.
Meantime Owner A, whom I did general contract work for, required a large order to be made up ASAP. I stated that I had restarted the blinds and that they would have to wait in that case. I asked Owner A to contact Customer B to say that she herself had in fact caused a further delay.
My health required lengthy therapy and I required lengthy periods of rest. I communicated this to Customer B who was now quite anxious to see her blinds. (I asked if she could wait until my therapy had finished in the summer. She agreed). She felt that it had taken too long (I have no argument with that) but as I had informed her along the way of all the delays which were the result of situations out with my control, I had thought that she understood.
She had had several conversations with Owner A over this period of time and changed her mind, and Owner A came to collect one finished blind, 3 unfinished blinds and all the parts so that someone else could finish them. She had in fact called me on a couple of occasions worse the wear of alcohol and had been slightly out of control. I asked her on both occasions not to phone me at such times as I did not merit any verbal abuse.
I have invoiced owner A for the lining fabric, parts, one heading rail and a completed blind - the work I have done.
Owner A is refusing to pay. She says the order came from the client. It was in fact Owner A who first asked me if I could make some blinds. It was not until I got the fabric that customer B contacted me with measurements.
I really would like to be paid what I am due and I believe that owner A is the one to receive the invoice. Customer B would not have asked me to make the blinds herself as she lives near Chester. I doubt she would have found me, nor contacted me independently.