- Original Poster
- #1
I am on assignment with a company whose accounts are a mess and I`m struggling to fix it.
I have spent a month posting a backlog of transactions onto Sage 50 for their financial year 2018 to 2019 and correcting transactions which were posted using the wrong bank account nominals. This part isn't so bad although the bank recs dont balance anymore. They dont balance as I have altered the bank nominals for many transactions to their correct ones.
I also have a further 500 transactions left unreconciled from their previous financial year. Most of these their staff weren't able to reconcile because they used the same kind of incorrect bank nominals etc. I cannot touch these as that year is closed.
What is the correct procedure for fixing this as I have never encountered a set of accounts as bad as these before?
Do I match all outstanding transactions in the rec windows for each bank account?
Then manually alter the nominals for each to show the correct amounts?
If it was my company I would start their financial year afresh on Sage 50 but is this allowed and even possible?
I have spent a month posting a backlog of transactions onto Sage 50 for their financial year 2018 to 2019 and correcting transactions which were posted using the wrong bank account nominals. This part isn't so bad although the bank recs dont balance anymore. They dont balance as I have altered the bank nominals for many transactions to their correct ones.
I also have a further 500 transactions left unreconciled from their previous financial year. Most of these their staff weren't able to reconcile because they used the same kind of incorrect bank nominals etc. I cannot touch these as that year is closed.
What is the correct procedure for fixing this as I have never encountered a set of accounts as bad as these before?
Do I match all outstanding transactions in the rec windows for each bank account?
Then manually alter the nominals for each to show the correct amounts?
If it was my company I would start their financial year afresh on Sage 50 but is this allowed and even possible?
