Hope someone can give me a ballpark figure...
I'm having an extension on the house. At two particular points we need to have deeper foundations to account for some trees that drain moisture from the soil.
The original quote includes foundations to 1.5m. We now have to have two strips of foundations that need to go to 2.5m and 2.3m respectively. Each new strip is about 3m in length. The rest of the foundations are OK to stay at 1.5m, but the builder will need to 'step' the foundations.
The original cost for the foundations is included in the quotation so I don't know the exact figure for the foundations (it includes site clearance, preparation, etc).
However, I suspect that it would involve approximately 25% more digging and concrete.
Does anyone have a ballpark figure of the extra costs I should be looking at??? The builder will tell me at the end of stage 1 (in about 2 weeks) but I'd also like to get some other figures for comparison.
Thanks in advance!
I'm having an extension on the house. At two particular points we need to have deeper foundations to account for some trees that drain moisture from the soil.
The original quote includes foundations to 1.5m. We now have to have two strips of foundations that need to go to 2.5m and 2.3m respectively. Each new strip is about 3m in length. The rest of the foundations are OK to stay at 1.5m, but the builder will need to 'step' the foundations.
The original cost for the foundations is included in the quotation so I don't know the exact figure for the foundations (it includes site clearance, preparation, etc).
However, I suspect that it would involve approximately 25% more digging and concrete.
Does anyone have a ballpark figure of the extra costs I should be looking at??? The builder will tell me at the end of stage 1 (in about 2 weeks) but I'd also like to get some other figures for comparison.
Thanks in advance!